Kisasa secondary school has given a support with Eltham College
to build the toilet. It is of ten rooms, according to the
headmaster of kisasa
secondary school mr. joseph mbilinyi, it will cost more
than 17.5millions for buying materals also this toilet will be used by girls only while
boys will still using the former toilet
which were using before building these new toilet.
Stages for construction is attached with the pictures
Round septic tank before coverage with cement and gravery sand.
these are rooms for the toilets bised is the rectangle septic tank.
Stages for construction is attached with the pictures
Round septic tank before coverage with cement and gravery sand.
these are rooms for the toilets bised is the rectangle septic tank.
No comments:
Post a Comment